How long does it take to repaint a house exterior?
Most single-storey homes take 1 to 2 weeks, depending on how much prep the surfaces need and what the weather does. Two-storey houses and homes with a lot of repair work take longer. A realistic start date and finish date go on every written quote, and we tell you early if conditions move them.
The stages of an exterior repaint
| Stage | What happens | Why it takes the time it does |
|---|---|---|
| Wash | Dirt, mould and chalky residue are washed off, then the house dries. | Paint will not bond to a dirty or damp surface, so drying time is part of the job. |
| Scrape, sand and fill | Loose paint is scraped, edges sanded and holes and cracks filled. | This is the biggest variable and depends on the condition of the old paint. |
| Repair and prime | Rot repairs, bare timber and rust are fixed and spot primed. | Primer needs to dry before topcoats go on. |
| Caulk and mask | Gaps are sealed and windows, glass and gardens are protected. | Careful masking saves clean-up and gives crisp lines. |
| First coat | Walls, soffits, fascias and joinery get the first full coat. | Each coat needs suitable weather and drying time. |
| Second coat | A second full coat is applied for coverage and durability. | Skipping it is the most common reason a repaint fails early. |
| Walkthrough | We inspect with you, touch up and remove the scaffold. | A final check finishes the job properly. |
What slows an exterior repaint down
- Condition of the old paint. Heavy flaking or many layers of paint mean more scraping and sanding.
- Rot and repairs. Fixing weatherboards, sills and fascias before painting adds days.
- Size and height. Two-storey houses need scaffold, and working at height is slower.
- Colour change. Going from dark to light often needs extra primer and coats.
- Weather. Rain, heavy dew, wind and cold can all stop exterior work.
How weather affects exterior painting in Canterbury
Paint needs the right temperature and dry surfaces to cure properly. Canterbury mornings can be cold with heavy dew, even in the warmer months, so we schedule coats around temperature and dew point and avoid painting when conditions are marginal. If the weather is not right we tell you rather than paint just to keep to the schedule, because paint applied in cold, damp conditions does not cure properly and fails early.
Can I stay in the house during an exterior repaint?
Yes. Exterior work happens outside, and we protect windows, doors and gardens as we go. You may want to keep windows closed on spray or sanding days, and we tell you in advance when that is.